See it loaded with your own tags
Tell us about the project. If you have an area and discipline breakdown, send it and we'll load it before the call.
Completions management for capital projects. The site team fills checksheets, raises punch and moves systems through stage gates. Owners see every project in one place, with every figure backed by a signed record.
One system. The site team works from it and owners report from it.
The Outstanding Work List shows what is left on each system: missing checksheets, open punch, constraints, DCN/TQs and test packs. Filter it by area and discipline, or export it to CSV for the morning meeting.
Completion, systems, punch counts and turnover packages for every project, side by side. Drill down from portfolio to project, area and system, right down to the signed certificate behind any number.
The field app puts checksheets, punch and work packs on a phone. Download a worklist while you have signal, work the shift without it, and sync when you're back in coverage.
Areas, systems, subsystems and tags, using your own numbering. Import them from Excel or CSV. Completion rolls up the hierarchy automatically.
Checklist items, readings, punch-on-fail and witness signatures. Filled on a tablet, reviewed, and archived as a signed PDF on approval.
A system moves to the next phase only when the gate criteria pass. Overrides need authority, a reason and a signature, and stay on the record.
Raise punch on a walkdown with a photo, categorise it A/B/C, assign it to a contractor and track ageing against target dates.
Factory witness tests and delivery checks, test packs with pressures and hold times, and IST scenarios with per-system results and retests.
A system with an open constraint cannot pass its next gate until the constraint is cleared or waived.
Industry templates set up the phases, disciplines, tag types, certificate types and gate criteria for a new project. Load the tag register and start work.
After validation sign-off, the structure, tags and templates lock. Changes need override authority and are logged.
Drill down by area, discipline or phase. Export registers to CSV and Excel. Generate turnover package and commissioning report PDFs. Every figure traces to a signed record.
When a system passes a gate, CompletionIQ drafts the milestone certificate. It records the criteria as evaluated, the evidence counts behind them, and any override with its reason and signatory. Completions issues it, commissioning countersigns it, and the archived PDF carries every signature.
Level 0–5 commissioning per system, IST scenarios with witness sign-off, and redundancy records tracked against tenant handover dates.
Mechanical completion, pre-commissioning and commissioning phases, with test packs, punch categories and turnover packages. Brownfield or greenfield.
Phase-gated evidence, frozen validation baselines and exportable registers, for projects where the record gets audited.
Status colours use the Okabe–Ito colourblind-safe palette, and every badge also carries its own icon and label, so no state depends on colour alone. Around one in twelve men and one in two hundred women have a colour-vision deficiency. That should never be why a hold point is missed.
Tell us about the project. If you have an area and discipline breakdown, send it and we'll load it before the call.